This has been a pretty productive week. This Owl D9P has been quilted. I would quilt a row and then go knit. However, by the time I got to the end I was up to two rows at a time.
I finished embroidering the label and have sewn the binding to the front.
Isn’t that owl cute?
I also got the owl 9 patch put together and ready for quilting. I will be using the same Minkie and, in fact, I already have it on the frame. I put the whole 3 yards on the frame before I started quilting the D9P so I just have to reattach the top of the leftover part and off I will be going, again. Yea!!
And I even decided on my next baby quilt. I have this bin of 30s scraps that I have been trying to figure out how to use up (not my favorite type of fabric). So I have a plan and will begin working on it this week.
I did not do any work on the big owl quilt but will be working on it side by side with these other three.
I get a lot of comments on how much I get done. I do want to say that it takes me a lot longer these days to complete anything because I have to take rest brakes quite frequently. I do try to knit while resting but sometimes even that is too much. I have found that at least twice a week I now get/have to take naps (the puppies love that). All that being said, I need to say that I am so grateful that I am able to work/play in my studio and knit everywhere. God has been very good to me.
I am linking up with Patchwork Times so I can share the creativity of many other quilters. Have a GREAT week.
Gari