There is nothing on my design wall. I decided to take the owl blocks down as I seem to be stalled in the sashing and sewing sections together. I really wanted to get that quilt done in time for our guild quilt show in November but then I realized that I was putting too much pressure on myself and making it no fun at all. So I have put it away and will not bring it back out until after the first of the year.
This weekend I used my GO to cut strips and squares: this was done as a break from knitting (kind of a reverse from my usual time management). My current plan is to start sewing these together, two by two, sometime this week. No, I don’t have a plan, yet, but eventually I will have. Meanwhile I will be sewing and probably cutting more strips and squares.
I have some strips ready to cut more but I really like to have the die full so that I am cutting fabric and not the mat.
And it seems that I have a “commission” quilt coming. It is for DH. He came to me today and said that he is culling his extensive t-shirt collection and wants me to begin putting together. Several years ago I suggested a t-shirt quilt and told him to cut each shirt he wanted in the quilt up the back and then I would cut the part I wanted to use. What did he do? He cut each little logo out. So this time I told him to cut “nothing”, just bring me the t-shirts as he comes across them.
In addition to cutting, sewing, and knitting, I am going to try to empty some studio furniture, that is going to a pet adoption yard sale, and then move some other furniture around. I have been planning this for a few months but with the yard sale coming in October I need to get these things moved out onto the deck and ready to go. The bad thing about this plan is that everything in the studio is going to be in more of a mess than it usually is. The good thing is that I will able to build a large fabric storage wall. Oh, won’t that be nice?
And now it is time to check out, at Patchwork Times, what lots of other people are up to, creatively. I do hope that everyone has a great week. Gari
Talk about lack of knitting excitement. This is my two sweater fronts at 9 1/2” with only 17 1/2” to go. It is 1x1 rib and then pearl back over and over and over again so it is not hard, except when I get off on the 1x1 and have to rip out 3 rows, but with 106 stitches between the two fronts, it doesn’t go very fast.
Can you see that little orange marker in the lower left corner? When I started doing the two fronts together I got confused as to which one I left off with. So I have them hooked together so they almost knit as one. This has made the process much easier and kept them even.
I finally got back to my new socks and got the toes done. I am now ready to just knit on the foot part (yes, I know it is called the instep but to me it is just the foot part as opposed to the toe, heel, ankle/leg). This yarn is very soft so I plan on having very warm feet this winter no matter what the weather.
So for a little color I thought I would add this little vignette from our deck. The chair is one or two we got at an arts festival in Fairhope, AL a couple of years ago. They are really comfortable. We bought some several years ago and wore them out so were really happy to see this family owned business still going.
The bright yellow/orange planter was purchased last weekend on our Flea Market trip in FL. It is made from a golf cart tire. For some reason I was impressed by this recycling use and also I had the perfect plant to put it in. We needed a little color on our deck and this was just the thing.
Today I am taking it easy as I seem to have pulled two ribs apart and have a very painful left side. DH bought me an elastic band to hold my ribs together but it doesn’t help much when I either cough or sneeze. Also I have found that shallow breathing is tiring to do over an extended period of time. That said, my hectic plan for this weekend is to spend a great deal of time knitting.
I hope everyone has a great weekend (share with me, please) and I am, as usual, linking with Patchwork Times. Gari
But I am about half done and the end is off the floor, something I get very excited about.
I love how the quilting shows so clearly on the colored pieces and then seems to melt into the black and white strips. Close up all of the quilting shows but the mistakes do not. Isn’t that great?
This is the label for this quilt. I didn’t put my name on it because it is a charity quilt and most places don’t want the quilt maker’s name on it.
This is kind of funny looking, isn’t it? Can you guess what it is?
It is the 2 1/2” Go die and mat. I really didn’t think this was something I would want but recognizing that I really don’t enjoy cutting fabric, and that I am planning on making more kids charity quilts which frequently use 2 1/2” strips, I decided this was a more worthwhile purchase than I had previously thought. Anyway, it arrived this week and although I haven’t had time to use it yet, I am very pleased with it. Do you see those black lines? They are there to set fabric on to cut at different degrees for different shapes. Doesn’t this seem like fun?
And here is my excuse for not getting any more done. We spent all day Friday chasing the Flea Across Florida trail. It seemed like a great idea but several of the sites were either not there or we couldn’t find them. Now understand that we traveled the less populated route, which was a very pleasant ride, and never did get to the city areas. But I have the names and addresses of several antique sites that we can visit at another time. Anyway, we did buy this sculpture and the tomatoes (great for BLTs) and some other things I will try to have pictures of next Friday.
Be sure to stop by on Friday when I share my knitting. And before then click on over to Patchwork Times to see the artwork of other quilters. Have a great week, Gari