This is part of my backyard.
Three years ago, when we got our new house, we had to run a new line to the septic tank. The plumber put the pipe (50’) in and then my SIL brought a load of dirt to fill it in. He was supposed to come back with a back hoe and shove the dirt into the trench, covering the pipe. Well, the pile is still there and the pipe has been exposed all this time. From time to time I have shoveled dirt and this week I finally got the pipe all covered. What you see is what we have affectionately called Mt. Musgrove and the wheelbarrow I have moved the dirt with. I still have several loads to move until we don’t have an indentation in the ground but it is nice to be able to not see that white PVC pipe anymore.
When not moving dirt I have been still working. I got the binding made, pressed and sewed onto Jazz. And I even got the label made in time to sew it into the binding.
I have the binding turned and clipped, ready to hand sew on but that will probably have to wait a couple of days while I work on other things.
I woke up yesterday morning remembering that I have a BOM $5 block due on Thursday. So first thing, after doing my early morning yard work, I set out to get it done.
I really enjoyed making this block and may look at featuring it in a quilt sometime in the future.
My next project, I think, is going to have to be some clean-up in the studio. It seems that there are little piles of scraps and stuff from each of the projects I have been working on. This was OK for a while but now there are no work surfaces left. LOL
We have had one other excitement this week. DH gave birth to this.
Well, that’s all for now: don’t you think that has been enough? LOL