Thursday, August 13, 2009

Maryland Visit Post 2



Maryland can be a very tiring place. Yesterday, Wednesday, we were on our own as both DS#2 and DIL were at work. I spent the morning on the computer and after lunch we took off to explore. Our first stop was G Street Fabrics. I was really excited because it had been highly recommended. And it was impressive. They carry excellent clothing fabric, upholstery fabric and drapery fabric. Their quilting fabric was somewhat disappointing. There was a much smaller selection than I expected. However, the “button room” was impressive. I spent quite a long time looking at these.













Our next stop was an Antique Village in Kensington. This was several shops with a nice assortment of antiques. Some of the shops were closed so it didn’t take us too long to see everything. And then we started back to the house. Well, I had forgotten just one small thing. I hadn’t entered DS’s address in the GPS and didn’t have it written down. We tried to call DS but he was unavailable. Did you know that the greater DC area is quite large with streets that run in crooked directions? I was initially concerned that we would get lost but then I decided to try entering the street only and it took us right to where we wanted to go. I was really glad to see the house.

Today we went to an Amish market and bought pies, rolls, candy and a pretzel for lunch. (did I ever say I was with Weight Watchers?). Then we were on our way to Catholic University where DS has recently begun working. But, on our way we were treated to this.


They were in the middle of the street with about 10 police, three ambulances and other assorted emergency people. Of course we don’t know what happened but it was interesting.








Here are some pictures from CUA.


We did a walking tour of the university but since DS has only been there for 1.5 months he was not sure what each of the buildings were used for.






We did get to see the basilica, a beautiful cathedral,








as well as DS’s new office and the general administrative buildings.
CUA was founded in 1887 and this is the oldest building on campus. I guess we will have to come back to find out about the other buildings.












Our last stop for the day was IKEA.











I know that most people seem to know about IKEA but we don’t have one in AL so I had asked to go there. What fun! I saw several things I would love to have but since we are traveling in the Mustang, I just bought this.










Wednesday, August 12, 2009

On The Road

So, every once in a while I have a bright idea. The most recent one was that since we were planning to drive the 1000 miles from home to DS#3 in MD, we would take a nap in the afternoon and start our trip at around 6pm. That way we could drive all night, miss rush hour traffic in Atlanta and DC and arrive at a reasonable, visiting, hour the next day. And, unlike some of my other bright ideas, this one worked perfectly.



On Monday we packed the car.









The boxlike structure in the back seat is our travel refrigerator. This is a wonderful invention. We carry canned drinks, fruit, and can store the second half of Subway footlongs to have later. The large bag in the back is my “handwork:” a little hand embroidery project and a large (Alabama Escargot) quilt to finish binding.


Except for one small 22 mile detour to get back on the right highway, the trip went smoothly and was uneventful. We didn’t even encounter any crazy drivers: not bad for 17 hours. I, unfortunately, didn’t think to take pictures of the beautiful Shenandoah Valley as we passed through it: maybe on our way home. And we arrived in good shape (DH was walking a little funny).
DS had taken the day off from work to be here for us and, after a trip to Best Buy, he and DH were busy working on a computer project.
NOTE: All three of my sons are computer whizzes.




While dinner cooked I presented DS and DDIL with their somewhat late wedding gift, now a wedding and new house gift.
This quilt was started in October 2007 for the wedding in March 2008. I had gotten 3 flower blocks done when the fiancé told me her grandmother had commissioned a quilt pro to make a wedding quilt for them. Well, I was STRUGGLING with the appliqué and somewhat overwhelmed with how many I still had to do and the whole project came to a halt: I machine embroidered a table cloth and napkins for them and put this quilt away. Then sometime this past spring I started working on it again. Later I will blog some of the pictures and what it was like but, again, the further along I went the more I loved it.
When it was almost done I did make the decision to machine sew the label into the binding thus ensuring that I gave it away rather than keeping it for myself. LOL


Today, both of our hosts are working so we are resting and will do a little exploring on our own. I have heard there is a great quilt shop not too far away so, with my GPS, I hope to do a little fabric shopping. Yea!!

Friday, August 7, 2009

A Little This, A Little That

The weather has been wonderful: low 90s, sunshine and a nice breeze. I have found myself balancing piecing with reading (and of course housework). And look at what a week of rain and then sunshine has done for my plants. My hydrangea flower is getting bigger and my roses are outdoing themselves.








I did get all my Dresden plates done and have started working on a layout.






I also have been working on the A Tisket A Tasket BOM at Bunny Hill. I got a late start with these but have now gotten them done through May.


And, I have made another Quilt in a Cup.





They have come out with a lidded cup so, of course, I had to have one. It arrived Wednesday and Thursday I was busy making a little quilt for it.












See, I even made a label for it.


DH and I will be leaving for Maryland on Monday so I am putting together some things to work on while we are traveling and visiting. Each of the above BOM blocks have a small amount of hand embroidery to complete so I am bringing them along. I did a lot of hand embroidery MANY years ago so figure I can do a little now. LOL I will also be sewing down the binding on Alabama Escargot. Any bets on how much I actually get done?


I am currently enjoying an evening “home alone.” DH has been assisting with a college musical, Footloose, and the first performance is tonight. I went to the dress rehearsal last night and it was terrific. Tonight I am finishing the laundry, reading blogs, and beginning the planning for packing. And I guess that sitting here writing/reading on the computer isn’t getting any of that done so I better get off and get busy.

Tuesday, August 4, 2009

I love my husband.


I really do. However yesterday, while working on these, he came home from work toting a bright red jacket and a red baseball cap.

Would/Could I embroider a “B” on the cap, the jacket front (to cover something else) and on the back? Seems it is needed for the play he is helping with which, by the way, is going on this weekend.

So I spent some time on the computer finding a good font and then setting up three designs, the letter “B” at 1.5”









4.5”





and 6”. I got the cap done and the front of the jacket but then had to leave for my Weight Watcher’s meeting: I left the machine stitching away so the letter was done when I got home. The jacket, however, went to rehearsal and didn’t make it back so I guess I will be appliquéing it on tomorrow.


Today was laundry day (no pictures of that. LOL) so when I was done I spent some quality time in the pool. No shots of me in there but the thermometer ducky also had a good time.







Then I decided that the best dinner we could have was pizza so we jumped in my car and enjoyed the wind in our hair on our way.


Then when I got home I noticed that one of my hydrangea bushes seems to have a flower coming. I searched both plants but didn’t see another potential flower.




Saturday, August 1, 2009

Bits and Pieces

This has been a week of catching up. The first thing I did, of course, was to make the binding for AE and sew it on. I have the clips all on it, have packed up a little sewing kit, and am ready to hit the road in 8 days and finish the hand sewing. Next I attempted to put some order into the studio and even folded up and put away the left over batiks. Funny thing was that when I got it all back up on the shelf, it didn’t look like I had used any at all. LOL

Next I decided to start on a block swap I am doing with an embroidery site, Nita’s Place. This will be the third swap I have done with them. We make 12, or more, blocks with an embroidery placed in the middle of the blocks. The block we are using is Contrary Wife from Quilters Cache and our blocks are supposed to be in autumn colors with a cream center. And the embroidery design is supplied by Nita O’Keefe. Anyway, since I will be gone for a week I decided the best thing for me to do was to start now. I pulled out some 4” Thangles that I had been given and got all the half square triangles done and put the non-embroidered rows together.





And this is kind of what the block will look like: imagine an embroidery design in the middle.


After getting these blocks as far along as I could I remembered a BOM from last year that I didn’t quite finish. So I pulled it out and did the last block. This was a Thangles BOM that I found quite boring. Every month it was the same thing, do some half square triangles, cut some little squares and put them together: no challenge. You can tell this by this picture.


I had planned a couple of layouts for these little squares so I decided that my UFO for August is going to be getting these set and a top done.


I also started a new project but it is one of those that I can’t show until it is done and gifted. All the fabric is chosen and I did start the cutting. It will be pretty easy so I hope to have it done by the end of the month.

Wednesday, July 29, 2009

Hooray!

Alabama Escargot is quilted.

I had some thread breakage: got to quilt three passes twice. I have decided that when I find the thread broken it is another opportunity to practice. LOL



Here is the backing with the quilted label.






And a couple of close ups.











Anyway, I took this off the frame this afternoon and then cut the strips for the binding. I plan to sew the binding on tomorrow and then I will pack it away for a week. We will get taking a trip next month and I am taking this quilt with me as my “handwork” project. I know it is a little big but I don’t do any other handwork and I need something to keep me busy on the drive and during the evenings while visiting. I will post pictures of it when it is all completed.

Monday, July 27, 2009

Bye Bye Beach




It was with deep regret that we packed up late Sunday afternoon and headed away from the beach and back home. It was kind of funny because I when leaving home for the beach I had regretted leaving the quilting I really wanted to do and now I was regretting heading home. I guess I just can’t be satisfied. However look how rested I looked at the beach.



This morning I was up and ready to get back to quilting. After a good cup of coffee and breakfast, I was off to the studio. I sewed the two parts of the backing together and appliquéd the label to the back. Once that was done it was time to load the quilt onto the frame. Sometimes I forget how many steps there are to that but eventually everything was set and I was ready to quilt.


However, before I could get started DH called and invited me to lunch (Taco Bell). Well who could resist that? So, off I went.


The panto I am using is Siberian Iris from
Urbanelementz.



After some auditioning, I decided on a lavender thread for the top: I want it to be seen but not to take attention from the fabric and piecing. All was going well until about 6 when I found that I had quilted a half of a row without any bobbin thread. At that point I decided it was time to rest and head for the house for some food, TV, and blogging.